PC DRAM · 2Q23 · 2023-03-28
PC DRAM: -15 to -10% QoQ ASP forecast for 2Q23, published by TrendForce on 2023-03-28.
-15 to -10%QoQ ASP · Forecast · 2Q23
The reading and its basis
- Memory Memory family. HBM is separated from conventional DRAM.
- DRAM 1
- Reading type Spot and contract readings may be absolute snapshots or labelled percentage changes. Forecasts are estimates; reported ASP is a supplier portfolio result.
- Forecast 1
- Metric Absolute spot/contract price, quarterly contract-price change, supplier ASP change or HBM outlook; always read with comparison basis.
- ASP change forecast 1
- Product / scope Exact component, module or aggregate covered by the source; Gb and GB are preserved.
- PC DRAM 1
- Source date The table update date for snapshots, or publication date for forecasts and filings. GMT+8 timestamps are retained in period.
- 2023-03-28 1
- Period / session Price session or target period. Fiscal years are explicitly labelled.
- 2Q23 1
- Change / outlook Signed source change, forecast range, or approximate supplier ASP change. Read with comparison basis; forecasts are never realized prices.
- -15 to -10% 1
- Comparison basis Session, average change, quarter-on-quarter, year-on-year, or explicit relative premium.
- QoQ ASP 1
- Forecast lower % Lower end of a published forecast percentage range. A point estimate has equal lower and upper values.
- -15 1
- Forecast upper % Upper end of a published forecast percentage range.
- -10 1
- Publisher Originating research publisher or filing issuer.
- TrendForce 1
- Status Snapshot, original or revised forecast, and reported result are kept distinct. Superseded forecasts remain as dated history.
- Forecast 1
Source trail
- TrendForce: 2Q23 DRAM price outlook, 2023-03-28 accessed 2026-11-19
Related readings
DRAM pricesField definitions and methodology · Download the full ledger